Simrad SP270
4
851-160571 / B
Installation procedures
The installation of the standard SP 270 Sonar system includes
the following stages:
• Mounting the Installation Trunk
• Mounting the Hull Unit
• Mounting the Transceiver Unit
• Mounting the Sonar Control Unit
• Cabling
• Start-Up
• Final Test
Refer to the cable plan, the main interconnection diagrams and
the outline dimensions drawings of the units.
The equipment, once unpacked, must be stored inside in a room
with an atmosphere free from corrosive agents. In addition, the
equipment must be covered to protect it from dust and other
forms of contamination.