Simrad MN000802A-G Przewodnik Instalacji Strona 44

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
  • Strona
    / 71
  • Spis treści
  • BOOKMARKI
  • Oceniono. / 5. Na podstawie oceny klientów
Przeglądanie stron 43
9.2 Connect the 2 kW radar processor to a 6000i or 6100i display
The following diagram shows the recommended method for connecting a radar processor to a
6000i or 6100i display unit:
If you're connecting the 2 kW radar to a Northstar 6000i or 6100i system, a 10 ft (3 m) radar
communications cable (NS003107) is supplied with the 6000i or 6100i system. If this is not long
enough, an optional 6 ft (1.8 m) extension cable (NS003108) can be added. between the radar
processor and the 6000i. This extension cable is not supplied as standard, and must be ordered
separately.
Item Function
A Junction box
B To NMEA Device 1
C To NMEA Device 2
D To Smartcraft
E Remote power
Przeglądanie stron 43
1 2 ... 39 40 41 42 43 44 45 46 47 48 49 ... 70 71

Komentarze do niniejszej Instrukcji

Brak uwag